Loop Parkway Today

Loop Parkway Today - For the next two weeks. The loop parkway, which connects the meadowbrook parkway to point lookout, will be closed from 10 p. m. Until 5 a. m. Summer's nearly over, but. The highway will shut, weather permitting, both ways from loop parkway to bay parkway. The repaving project between bay parkway and merrick road is. A construction project to replace the steel decking on two historic drawbridges on the loop parkway and meadowbrook parkway, halted in may to allow for summer beach. The loop parkway, which connects the meadowbrook parkway to point lookout, will be closed from 10 p. m. Until 5 a. m. It serves the barrier islands south of long. Zillow has 22 photos of this $304,900 4 beds, 2 baths, 1,774 square feet single family home located at 9392 parkway gardens loop, tuscaloosa, al 35405 built in 2025. The loop parkway bridge is currently closed in both directions.

For the next two weeks. The loop parkway, which connects the meadowbrook parkway to point lookout, will be closed from 10 p. m. Until 5 a. m. Summer's nearly over, but. The highway will shut, weather permitting, both ways from loop parkway to bay parkway. The repaving project between bay parkway and merrick road is. A construction project to replace the steel decking on two historic drawbridges on the loop parkway and meadowbrook parkway, halted in may to allow for summer beach.

Loop Parkway Today